← Blog
Company2 min read

Critical Path in Chester: Our October Build Night

On Wednesday 21 October we ran Critical Path at The Cornerhouse in Chester: two hours, from six until eight, for people with one job they wanted to stop doing by hand. It was free, food and drinks were on us, and we kept it to fifteen places on purpose.

The idea is simple. You bring the job that eats your week, and you leave with it running as a flow, connected to your own systems and working on your own data. Not a demo account, and not a slide about what might be possible one day.

Andy introducing the evening in front of a projected agenda
Fifteen minutes of introduction, then straight into building

How the evening ran

The format is short and fixed, so that almost all of the time goes on building:

  • Six o'clock, introduction. Fifteen minutes: everyone says what they brought, then a quick tour of triggers, branches, retries and expressions. Enough to build with, not enough to be a lecture.
  • Quarter past six, build. An hour and a half with an engineer beside you, on your own flow, connected to your real systems. That includes the unglamorous half: what happens when a step fails, and what the flow does at two in the morning.
  • Quarter to eight, debrief. Fifteen minutes on what got working, what got in the way, and where the platform let people down.
Two people building a flow together on a laptop in a quiet corner
An engineer alongside you for the whole build

The debrief is the part we come for. Watching people wire up the job they know best tells us more about Flomation than any amount of testing in-house, and the rough edges they hit go straight onto our list.

Small on purpose

Fifteen places means there is an engineer within reach whenever someone gets stuck, and time for everyone to talk through their job rather than a few loud voices. It also means the evening is a conversation as much as a workshop, which is what the food and the bar are for.

Pizza and sharing platters laid out by the window
Food and drinks served throughout
Attendees chatting at the bar of The Cornerhouse
Time to talk as well as build

Everyone went home with a Flomation bag.

Two Flomation paper bags on a wooden table
Everyone left with something

The next one

Critical Path runs every quarter. The next date and venue are being confirmed now. Register your interest and you will hear before it is announced anywhere else, with first refusal on the fifteen places. Bring one job, the worst one, and we will help you hand it over.

Automate the thing you just read about

The free plan covers a real workflow end to end. Build it in the editor, run it on a trigger, see every step.